Our Achievements in 1998

  • Mobile Switching Center (MSC)
    We completed three(3) MSCs in 1998, involving site preparation works, telecom works, and installation of SMR and batteries.  All works were done with good quality.
  • Base Transceiver Station (BTS)
    We completed 197 BTS sites in northern Taiwan, involving site preparation works.
  • Test of HV/LV electrical facilities for Ford Lio-Ho Motor Co., Ltd.
  • DDS (Detection of Defects Inspection Lighting System) for Ford Lio-Ho Motor Co., Ltd.

Our Achievements in 1999

  • We completed two(2) MSCs up in Taipei, one for Nokia, and the other for Lucent.
  • We completed 15 BSCs, 6 of them were in the south, for Nokia; 9 of them were in the north, for Lucent.
  • Additionally, we completed 163 BTS sites in the south for Nokia, 100 BTS sites in the north for Lucent.

Our Achievements in 2000

  • Wireless Mobile System
    MSC
    We completed five (5) MSCs, with a total contract amount of over 150m NT$ for site preparations and telecom works, and DC power system.
    BSC
    We completed five (5) BSCs, mainly site preparation works, and some telecom works also involved.
    MetroHub
    We completed eight (8) MetroHubs, involving both site preparation and telecom works.
    BTS(New)
    We completed 100 BTS sites in the north for Nokia.  It was a turn-key job, from SAQ, TSS, designs, site preparation works, telecom implementation (installation of feeder, antenna, BTS, commissioning, integration and trouble shooting.  IP application package and Lease Line (LL) application).  Additionally, we completed 50 sites for KGT.
    BTS(Swap)
    We completed 100 BTS sites in the central for Nokia.
  • Fixed Network System
    We completed one(1) switching center in Kaohsiung for NCIC.  It was a turn-key job.
    We completed four (4) broadband fiber Network BackBone Equipment Rooms for LambdaNet, site preparation works only.
    We completed 15 sites of AM1 for Lucent.  Installation and wiring were involved in the works.
  • Industrial Plants
    We completed one(1) high speed fire detection fighting system for autospray machines in the Paint Shop of Ford Lio-Ho Motor Co., Ltd.  The equipment is from Germany.  The system has been working nicely and no false operation has been reported since service began in Sept. 2000.

Our Achievements in 2001

  • Wireless Mobile System
    BTS(New)
    100 sites completed on a turn-key basis.  Additionally, 50 sites had also been completed.
    BTS(Swap)
    21 sites were completed.
    1 HLRi completed for KGT in Taipei and 1 in Kaohsiung.
    One 3G Testbed Platform completed for KGT in Taipei.
  • Fixed Network System
    One BB Equipment Room was completed for LambdaNet.
    We completed installation, wiring and local test for    87 sets of AnyMedia for Lucent project for TFN.
    We completed installation, wiring and local test for 27 sites (49 sets) of ADM 16/1 for Lucent project for TFN.
    ONU (Sub BackBone): 152 sites
    CSU/DSU E1 (User side): 8 sites
    ADSL (User side): 129 sites
  • Sea Cable Landing Station
    Turn-key: From design to installation
    Owner: Asia Global Crossing Taiwan Inc./NEC system Integration & Construction, Ltd.(NESIC)/Chinsune
    Project: EAC2 TWN Cable Landing Station, Pali, Taipei  County.
    Schedule: Kicked off in August 2001, completed and accepted by customer in April 2002.

Our Achievements in 2002, 2003, 2004 & 2005.

  • Already summarized in section 5.1 above.


Our Achievements in 2002

  • Wireless Mobile System
    • MSC
      One(1) completed, including site preparations and telecom works. Another one MSC site located at Wu-Ku dismantled.
    • BSC and TCSM
      Two(2) BSC and 5 TCSM completed, site preparation and telecom works.
    • BTS(New)
      For Nokia: MRT-36 sites, Ph4-135 sites Ph5-60 sites For KGT: 78 sites (N, C&S)
    • DDF extension works
      North-6, Central-2, South-2
  • Fixed Network System
    • BackBone(BB) Equipment Room x 1
    • AM1 x 1
    • AnyMedia x 19
    • ONU(Sub BackBone) x 70
    • ADSL’s PPPo x 2
    • CSU/DSU(Loop1) x 203
    • CSU/DSU(Digit Link) x 15
    • In-building PCM cabling x 40
    • DDF Extension: 10
    • Telephone installation and cabling x 217
    • Switching system-1240 x 5
    • SDH System x 25
    • Proving 13 engineers to support
      Alcatel-Taisel’s Project for CHT Ph2, including SDH system testing/commissioning & NMS.
  • Electrical & Mechanical
    • Ford Lio-Ho Motor Co., Ltd.
      • Test of HV/LV electrical facilities
      • Replacement of VCB, ACB & VCS x 11sets

Our Achievements in 2003

  • Mobile Network System
    • Nokia CHT 3G Project-Ph1
      Node-B x 100(North)
    • Nokia TWM 3G Project-Ph1
      • RF network planning/optimization service for north, teamed up with Flextronics.
      • Node-B x 100(North)

    • Nokia KGT BTS Project-Ph5, Batch 3&4
      New x 57, Swap x 9 (N1+N2+C)
    • KGT BTS Project
      • Ph5 Civil works x 33(N1+N2+C)
      • Re-engineering x 32(N2)
      • Cabinet Extension x 40(N1+N2)
      • Dismantling & Reconstruction, Civil and TI works x 10 (N1+N2+S)
  • Fixed Network System
    • AM1 x 4
    • AnyMedia x 2
    • ADM 16/1 (BackBone) x 14
    • Proving 13 engineers to support
      Alcatel-Taisel’s Project for CHT Ph2, including SDH system testing/commissioning & NMS.
  • Electrical & Mechanical
    • Ford Lio-Ho Motor Co., Ltd.
      • Test of HV/LV electrical facilities
      • DDS x one production line at Paint Shop, i.e. Detection of Defects Inspection Lighting System.
      • Replacement of underground fire main
      • LNG project, including LNG receiving station, main pipelines and swap of diesel burners by LNG ones.
      • 5) Mitsubishi Heavy Industries Ltd.
        OCS and Substation Cabling works for Taiwan High Speed Rail Project.

Our Achievements in 2004

  • Mobile Network System
    • 3G Testbed Platform
    • Nokia CHT 3G Project-Ph2
      • Node-B x 100(North)
      • RNC x 2(Keelung & I-Lan)
    • Nokia TWM 3G Project-Ph2
      • Core x 1 lot(C)
      • RNC x 3(N), x 2(C)
      • Node-B x 300(North)
      • RF Network planning/optimization service, teamed up with Aircom,
        Ph2: 950(N), 175(C), 175(S)
        Ph2+: 550(N+C+S)
    • Nokia KGT BTS project, Batch 4(N1+N2+C+S)
      New x 24, Swap x 54
    • Nokia Care project for CHT 2/2.5/3G, Core Networks(OSS,SGSN, PS, CS, MSI….)
      Care Team: 5 Engineers
      Project Team: 3 Engineers
  • Electrical & Mechanical
    • Ford Lio-Ho Motor Co., Ltd.
      Test of HV/LV electrical facilities
    • Upgrade of 69-3.3KV electrical system(Ph1)
    • Continuation of LNG project, carried over from 2003.
    • MHI OCS works, carried over from 2003.

Our Achievements in 2005

  • Mobile Network System
    • 3G Testbed Platfom
      Relocation to the B1 floor of Nokia’s Head Office Building in Taipei.
    • Nokia CHT 3G project
      Ph2: Node-B x 60(N)
      Ph3: Node-B x 200(N)
    • Nokia TWM 3G project-Ph2/2+
      • Core x 1(C), RNC x 2(N), RNC x 1(C)
      • 3G RF Network planning/optimization service Carried over from 2004.
      • Node-B x 250(N2)
    • Nokia FET 3G Project-Ph3
      Node-B: 200(C)+250(S)
    • Nokia Care project for CHT 2/2.5/3G, Core Networks(OSS,SGSN, PS, CS, MSI….)
      Care Team: 4 Engineers
      Project Team: 1 Engineer
  • Electrical & Mechanical
    • Ford Lio-Ho Motor Co., Ltd.
      Test of HV/LV electrical facilities
    • Upgrade of 69/3/3KV
    • Leakage Alarm System for LNG pipelines in Paint Shop
    • Mitsubishi Heavy Industries Ltd.
      OCS and Substation Cabling works for Taiwan High Speed Rail Project.

Our Achievements in 2006

  • Telecom
    Nokia TWM 3G Ph2, Batch3 Project
    • Core Networks (For North and Central)
      MSC, MGW, SRRI, HLR, SGSN, GGSN, Server, OSS, Router, CISCO Switches, and so on.
    • RF Network Planning/Optimization
      Teamed up with Aircom, N1+N2+C+S: 1000
    • RNC
      North-6 (Guan-Dian Bldg. Nei-Hu), 2 (Chung-Li) Central-5
    • Node-B
      N1-200,  N2-250,  South-50
    • Nokia CHT 3G Node-B Project
      Continued with Ph3, which was kicked off in June 2006.
      North: 150+
    • Nokia FET 3G Node-B/In-Building Ph3.5/4 Project
      Central: 50 (Node-B)
      South: 100 (Node-B) & 25 (In-Building)
  • Mechanical & Electrical
    Taiwan High Speed Rail Project
    • OCS Installation Works(Sec.3-Chu-Bei)
    • OCS Maintenance Contract
    Ford Lio-Ho Motor Co., Ltd.
    • EHV/HV/LV Electrical System upgrade Project, Ph3.

Our Achievements in 2007

  • Telecom
    Nokia Siemens Networks (NSN)TWM 3G W-CDMA Project.
    • Core Networks (for North and Central)
      IMS, OSS, CISCO switches and so on.
    • RF Network Planning/Optimization(for North)
      Teamed up with GTC, N1+N2: 500
    • RNC
      North-2 (Guan-Dian Bldg. Nei-Hu)
    • Node-B
      N1-75,  N2-125,  South-10
    • NSN CHT 3G W-CDMA Project
      RF Network Planning/Optimization(for Central+South)
      Node-B, North: 150
    • NSN FET 3G W-CDMA/In-Building Phase4 Project
      South: 42
  • Mechanical & Electrical
    Taiwan High Speed Rail Project
    • OCS Maintenance Contract for whole Line.
    Ford Lio-Ho Motor Co., Ltd.
    • Continuation of EHV/HV/LV Electrical System Upgrade Project started in 2006.

Our Achievements in 2008

  • Telecom
    NSN TWM 3G W-CDMA Project.
    • Core Networks (for North)
      SR12, HLR, RNC and so on.
    • Node-B (for North)
    NSN CHT 3G W-CDMA Project
    • RF Network Planning/Optimization(for Central+South)
    NSN CHT NGN Project (North)
    NSN FET 3G W-CDMA Project(South)
    NSN CHT 3G W-CDMA Project
    • RF Network Planning/Opti(for Noth, Central and South)
  • Mechanical & Electrical
    Green Power Project
    • Solar, Wind, Fuel Cell Cogeneration and so on.

Our Achievements in 2009

  • Telecom
    NSN TWM 3G W-CDMA Project.
    • Core Networks (for North)
      SR12 x 6, RNC x 3 and son on.
    • Node-B for N1 & N2
      N1 x 150, N2 x 20
    NSN CHT 3G W-CDMA Project
    • RF Network Planning/Optimization for whole islands.
    NSN CHT NGN Project (North)
    FET E&C&TI, and Maintenance Project for South.
  • Mechanical & Electrical
    Far East Group
    • NCIC & FET機房機電工程
    Ford Lio-Ho Motor Co., Ltd.
    • HV/LV works.

Our Achievements in 2010

  • Telecom
    NSN TWM 3G W-CDMA Project.
    • Core & Node-B.
    NSN CHT 3G W-CDMA Project
    • RF for North.
    NSN CHT NGN Project
    NSN VIBO 3G W-CDMA project
    • Core for North.
    FET E&C&TI, and Maintenance Project for South.
  • Mechanical & Electrical
    Far East Group
    • FET機房UPS工程 x 9
    • 亞東技術學院停車場工程
    • 亞東醫院醫生值班及被服辦公室
    Ford Lio-Ho Motor Co., Ltd.
    • HV/LV works.

Our Achievements in 2011

  • Telecom
    NSN TWM 3G W-CDMA Project.
    • Core & Node-B.
    NSN CHT 3G W-CDMA Project
    • RF for Central & South.
    NSN VIBO 3G W-CDMA 2010 project
    • Core for North.
    FET E&C&TI, and Maintenance Project for N2 & South.
  • Mechanical & Electrical
    Far East Group
    NCIC & FET 機房機電工程

Our Achievements in 2012

  • Telecom
    NSN TWM 3G W-CDMA Project.
    • Core & Node-B.
    NSN CHT 3G W-CDMA Project
    • RF for North.
    NSN VIBO 3G W-CDMA project
    • Core for North.
    FET E&C&TI, and Maintenance Project for N2 & South.
    NSN CHT Project(NGN) IP Back Bone Extension Project.
  • Mechanical & Electrical
    Far East Group
    NCIC & FET 機房機電工程
    HV/LV Power System Inspection (FLH)

Our Achievements in 2013

  • Telecom
    NSN TWM 3G W-CDMA Project.
    • Core & Node-B for N1.
    NSN CHT 3G W-CDMA Project
    • RF services for North.
    FET E&C&TI, and Maintenance Project for N2 & South.
    NSN CHT Project(NGN) IP Back Bone Extension Project.
  • Mechanical & Electrical
    FET安康機房電力改善機電工程
    FET內壢機房備用主變壓器增設工程
    NCIC板橋IDC-MSC 326機房(1F)增設發電機系統工程
    NCIC板橋326機房1F SMR, 3F MSC UPS工程
    新竹遠東百貨機電消防更新工程
    AK IDC PDU新增迴路監控工程
    NCIC板橋326機房3F STS PDU工程
    AK IDC 1F NEW PDU工程
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power System Tests and Inspections.

Our Achievements in 2014

  • Telecom
    NSN TWM 3/4G Project.
    • Core & eNode-B for N1 & South.
    NSN CHT 3/4G RF Planning & Opti. Services
    • 3G: Island wide; 4G: Central+South
    NSN TSC/VIBO Core for N.
    NSN TST 4G Project Core & Hub site for N1.
    FET E&C & TI, and Maintenance Project for N2 & South.
  • Mechanical & Electrical
    FET AK IDC PDU新增迴路監控設備
    FET高雄國泰九如4F機房消防復原
    NCIC NH220二期電力改善工程
    FET AK IDC UPS 汰換工程3期
    FET太平機房4F-STS增設工程
    FET NCIC NH468 11F辦公室改建機房機電工程
    FET AK IDC 3F新設智慧型PDU工程
    FET PC 334 MSC & WK MSC高壓變壓器汰新工程
    NCIC板橋PC326 1F主變ATS、電驛、電錶、電容器汰換工程
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power System Tests and Inspections.
    • LNG系統檢修工程:偵漏警報系統及配管墊片更換

Our Achievements in 2015

  • Telecom
    Nokia TWM 3/4G Project.
    • Core & eNode-B for N1 & South.
    Nokia CHT 4G RF Planning & Opti. Services
    • Central+South
    Nokia TST/VIBO 3G Core for N.
    Nokia TST 4G Project Core & Hub site for N1.
    FET E&C & TI, and Maintenance Project for N2 & South.
  • Mechanical & Electrical
    NCIC高雄新衙IDC機房UPS系統設備擴充改善工程
    NCIC TC DU UPS improvement汰換
    SOGO敦化館總變電站變壓器更新工程
    FET礁溪HUB機房變壓器更換
    NCIC港墘IDC 2F PDU新增工程
    NCIC板橋PC326機房1F主變壓器、電容汰換工程(1期)
    NH468汰換高壓變壓器工程
    遠東高爾夫練習場便道路燈工程
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power System Tests and Inspections.
    • P/S鍋爐房LNG偵測系統增設
    • P/S變電站VCB, ACB更新

Our Achievements in 2016

  • Telecom
    Nokia TWM 3/4G Project.
    ERT APT 2/4G Project.
    • N1: 100     S: 83
    FET E&C & TI, Maintenance Project for N2.
    Ericsson CHT 4G RF Planning Service: N
    Nokia CHT 3G/4G RF Planning & Optimization
    • Service: Central+South.
    Nokia TST 4G Project Core/IPBB Exp. Phase 2
  • Mechanical & Electrical
    NCIC淡水海纜站油槽危險物改善工程
    SOGO敦化館變電站設備更新工程
    愛買巨城店改裝機電工程
    遠傳安康IDC高壓變壓器汰換工程
    遠傳高雄整合服務中心UPS工程
    SOGO忠孝店B3消防泵浦更新工程
    遠東都會Citysuper台茂店超市電源工程
    宜蘭大學機房UPS迴路配線修繕
    NCIC台中太平IDC ROOM-9 UPS&STS(II期)工程
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power System Tests and Inspections.
    • 69KV Main power station TR5維修保養, ABS(781)更換
    • P/S 燃燒機保養
    • P/S變電站VCB更換
    • 2016全廠區變壓器絕緣油(17台)更換

Our Achievements in 2017

  • Telecom
    Nokia TWM 3/4G Project.
    ERT APT 2/4G Project.
    • N1: 79       S: 14
    FET E&C & TI, Maintenance Project for N2.
    Ericsson CHT 4G RF Planning Service: N
    Nokia CHT 3G/4G RF Planning & Optimization
    • Service: Central+South.
    Nokia TST phase 4/5 RF Planning service: N2
    Nokia TST 4G Project Core/IPBB Exp. Phase 4-1, 2
    • Nokia TST 4G TI Project for N1
  • Mechanical & Electrical
    NCIC台中太平IDC發電機增設工程
    FET潭美機房電力改善工程
    愛買巨城店 B3F CVS區給排水及電力插座增補工程
    NCIC板橋PC326機房1F主變高壓TR A-HTR汰換工程
    佳安安康機房銅牌整理及臨時線佈放配合工程
    遠東都會Citysuper台茂店超市電源工程
    SOGO忠孝館及敦化館高壓設備部份更新工程
    FET內湖468 4F&6F UPS迴路改接工程
    FET AK IDC高壓變壓器汰換工程
    NCIC 板橋326機房3F STS增設及PDU改接工程
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power system tests and inspections.
    • 69KV Main Power Station設備更新
    • ABS(761)更新,VCB x2更新,低壓盤x2更新
    • P/S 3.3KV #4 Substation 新建工程
    • 2P/S TR#3 2000KVA & 泵浦房變壓器600KVA更新
    • P/S & B/S變電站電源獨立拆除連鎖控制回路線路
    • Fire Pump#2更新
    • PS空調箱LNG系統新建

Our Achievements in 2018

  • Telecom
    Nokia TWM 3/4G Project.
    FET E&C & TI, Maintenance Project for N2.
    Ericsson CHT 4G RF Planning Service: N
    Nokia CHT 3G/4G RF Planning & Optimization
    • Service: Central+South.
    Nokia TST phase 4/5 RF Planning service: N2
    Nokia TST 4G Project Core/IPBB Exp. Phase 4-1, 2
    • Nokia TST 4G TI Project for N1
  • Mechanical & Electrical
    NCIC台中太平IDC發電機增設工程
    FET / AK IDC 4F UPS & BATT汰換工程
    AK IDC 4F 新設智慧型PDU工程
    FET / AK IDC - PDU盤修改工程
    愛買三重店機電工程(空調改善)
    愛買永和店廁所改裝機電工程
    FET / 味全大樓B2動力線路燒毀復原工程
    校舍機電改裝工程
    NCIC / 燈具&迴路風口移位調整
    FET / 電壓偵測式保護繼電器
    愛買復興店B1F裝修機電工程
    校舍結構補強及整修工程規劃案(機電改裝工程追加減案)
    B1F-G3匯流排拆裝檢測修繕(內湖468-B1F機房)
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power system tests and inspections.
    • BS-1變電站VCB x2, ACB x2更新
    • PS-1變電站VCB x2更新
    • 壓器更新:FAP1 x200KVA增設、IT x150KVA更新、行政大樓x100KVA更新、廢水廠300KVA更新

Our Achievements in 2019

  • Telecom
    Nokia TWM 3/4G Project:(N1+S)
    Ericsson CHT 4G/5G RF Planning Service: N
    Nokia CHT 4G/5G RF Planning & Optimization
    • Service: Central+South.
    Nokia TST phase 4/5 RF Planning service: N2
    Nokia TST 4G Project Core/IPBB Exp. Phase 4-2
    • Nokia TST 4G TI Project for S
  • Mechanical & Electrical
    安康IDC 2F北機房PDU改接工程(二期)
    高雄新衙MSC 60KVA UPS汰換電氣工程
    高雄新衙IDC 3F UPS-B系統汰換工程
    五股機房UPS系統40KVA UPS汰換工程
    內湖468 B1高壓變電站機房BUSWAY燒毀緊急搶修工程
    高雄新衙IDC 3F UPS-B3系統擴充工程校舍機電改裝工程
    內湖468 B1高壓變電站機房BUSWAY Busway更換工程
    台中太平機房3F UPS1&2 60KVA 拆除改接工程
    高雄新衙 3F & 5F IT Room 擴充電氣工程
    Y2019-FET內湖468辦公室拆改5F 12F 機電消防工程
    SOGO忠孝店12F、13F機電消防工程(第二階段)
    板橋 334 照明改善工程
    新竹 HC/20 機房 UPS 拆除換新工程
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power system tests and inspections.
    • 69KV變電站避雷線更換
    • VCB PS-2/PS-3/BS-1各1
    • 全廠區變壓器絕緣油(9台)更換、變壓器IT x300KVA更新

Our Achievements in 2020

  • Telecom
    Nokia TWM 3/4/5G Project(N1+S)
    Ericsson CHT 5G RF Planning Service: N
    Nokia CHT 5G RF Planning & Optimization
    • Service: Central+South.
    Nokia TST phase 5 RF Planning service: N2
    Nokia TST 4G Project Core/IPBB Exp. Phase 6
    • Nokia TST 4G TI Project for S
  • Mechanical & Electrical
    內湖 468 8F 辦公室 8F/7F/6F/4F/3F 機電及消防工程
    NNH 468 IDC 機房增設 PDU 與機電系統調整工程
    SOGO忠孝店HT4迴路電氣設備汰換工程
    FET 頭份機房機電工程
    FET台中太平機房2樓 Room-8 PDU 擴充電氣工程
    TPKC IT Room 電力插座工程
    SOGO忠孝店各樓層安全門裝設電磁扣工程
    KGEX_109年節能績效示範推廣補助_電梯工程
    KGEX_109年節能績效示範推廣補助_照明工程
    忠孝店及敦化館高壓變電站電力設備更新工程
    安康 IDC 一樓南側專案電力工程
    NH468 總部大樓 1F 機電消防工程
    台中太平3F IT機房PDU增設工程
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power system tests and inspections.
    • 69KV變電站TR-7二次側電纜更新
    • LNG廚房管路更換
    • 全廠區變壓器絕緣油(3台)更換
    • 變壓器MFG x100KVA更新、變壓器P-29x50VA & P-18x50VA更新、變壓器P-79x40VA & P-22x300VA更新

Our Achievements in 2021

  • Telecom
    Nokia TWM 3/4/5G Project(N1+S)
    Ericsson CHT 5G RF Planning Service: N
    Nokia CHT 5G RF Planning & Optimization
    • Service: Central+South.
    Nokia TST phase 5 RF Planning service: N2
    Nokia TST 4G Project Core/IPBB Exp. Phase 7
    • Nokia TST 4G TI Project for S
  • Mechanical & Electrical
    FET楊梅機房電力工程
    NCIC內湖NH220辦公室標準層機電工程
    SOGO忠孝館1F-4F改裝機電、消防工程
    FET高雄新衙5F ROOM-2機房PDU增設工程
    7F追風改裝室內裝修增設消防設備工程
    五股機房增設PDU盤改裝工程
    安康IDC UPS2 ACB汰換工程
    安康IDC UPS3 ACB汰換工程 (追加)
    FET板橋334拆除工程與設備報廢拆除
    NCIC台中TC DU機房擴增電力工程
    安康IDC 4樓南側PDU增設工程
    Ford Lio Ho Motor Co., Ltd.
    • HV/LV Power system tests and inspections.
    • 消防總機避雷突波器安裝
    • LNG PS管路測漏
    • 變壓器FAP-1 x300KVA更新

 

Address

3F No. 25 Alley 20 Lane 26, Rui-Guang Road. Nei-Hu, Taipei, Taiwan

+886 (02) 8792 6688